Hello to all. First we want to wish you all a Merry Christmas and a Happy New Year.
We have some good news, our new facility will be finished built up to the end of January.
We temporally laid of the work on our Repro Playfields to speed up getting our new facility set up.
It is no use to always get back blows from companies that just don’t do the work as it should be, we need
to get there to do all the work ourselves. A lot of machinery has arrived and we have installed electric and
air system. Heating pipes are laid for the air system for the paint booth. Next step is to install the paint booth.
At the same time we are trying to get ahead of the PB playfield production.
At the beginning of January we can start moving the milling machines to our new facility,
Electric and Air system for them are set up, also the new vacuum units for them are ready.
We now have over 1000 square meters, so much space that we actually don’t know what to do with it, nice feeling.
Next year we can speed up production with new machinery and new staff, we are getting ready to rumble.
Enjoy your holidays
Best regards from Hamburg
Leon & Peter
20221121_152308 (resized).jpg20221121_152332 (resized).jpg20221121_152351 (resized).jpg20221216_101555 (resized).jpg20221216_101625 (resized).jpg20221216_101659 (resized).jpg20221216_101719 (resized).jpg